LEED Doesn't Stop at Design


If you've worked on a LEED project, you know that getting the building designed is only part of the process. Once construction starts, there are plans to implement, products to review, documentation to collect, and a whole lot of coordination to keep everything moving.


And let's be honest: the last thing a project team wants is to be chasing down product data sheets, waste tickets, and manufacturer declarations months after the work is complete. Documentation can become a time-consuming process that lingers long after substantial completion and punch list.


The good news? It doesn't have to be that way.


At Verdacity, we work with construction teams to make LEED requirements more manageable. The key is understanding what's needed, establishing responsibilities early, and building the process into work you're already doing.


Here are three areas where a little planning can make a big difference.


1. Start with a LEED contruction action plan

The best time to talk about LEED construction requirements is before work gets underway.


That's why we start with a preconstruction meeting. We walk through the project's LEED goals, discuss the requirements that apply to the contractor, and establish a construction action plan. The goal is simple: everyone should understand what needs to happen, who's responsible, and when we need the documentation.


The LEED action plan. Think of this as the roadmap for construction-phase LEED requirements. We identify the applicable prerequisites and credits, establish documentation responsibilities, and coordinate deadlines with the construction schedule. This gives the team a clear picture of what's expected instead of leaving everyone to figure it out as they go.


Construction Waste Management

Waste diversion can be straightforward when the process is established early. We need

to identify how waste will be sorted and tracked, determine what records are available from waste haulers, and make sure the team understands what documentation needs to be retained.


Weight tickets, receipts, and diversion reports can make or break the final documentation. If nobody is collecting them, they're difficult to reconstruct later.


Construction Indoor Air Quality Management Plan


Construction activities can introduce dust and contaminants into a building, and HVAC systems and installed materials need to be protected. The plan establishes procedures for things like protecting ductwork, managing dust, storing absorptive materials, and controlling potential sources of contamination.


These aren't just items to check off for LEED. They're practices that help protect the building and prepare it for the people who will eventually occupy it.


Why does this matter? A little coordination up front helps avoid surprises later. It also gives the superintendent and project team a clear understanding of what's expected without adding unnecessary work to an already busy schedule.


2. Manage material submittals and LEED documentation

Material submittals are one of the biggest opportunities to keep a LEED project on track.

The good news is that you're already collecting submittals for most products going into the building. The trick is making sure we're collecting the right additional documentation at the same time.


And here's something worth emphasizing: not every product needs to qualify for every LEED credit. Quite frankly, they don't need to. We're looking at the project's specific goals, identifying where products can contribute, and tracking progress toward the required thresholds. We want to focus our efforts where they'll have the greatest impact.


Here are some of the key areas we track.


Environmental Product Declarations (EPDs)

When we're selecting building materials, how do we know which products have a lower environmental impact? That's where Environmental Product Declarations, or EPDs, come in.


An EPD is a standardized report that communicates the environmental impacts associated with a product throughout its life cycle. This can include raw material extraction, energy and water use, waste generation, and emissions to air, water, and soil. EPDs follow established reporting standards and are independently verified under applicable program requirements, giving project teams more reliable information to evaluate products.


Why does this matter? Building materials have environmental impacts long before they arrive at the jobsite. By encouraging manufacturers to disclose those impacts, LEED helps make environmental performance more transparent and gives project teams better information when comparing similar products. Over time, this also encourages manufacturers to measure and improve the environmental performance of their products.


For the construction team, the process starts with identifying products that have qualifying EPDs and collecting the required documentation during submittals. Not every EPD automatically qualifies, and having one doesn't necessarily mean a product has a lower environmental impact. It means we have better information to evaluate its impacts and determine whether it contributes to the project's LEED goals.


At Verdacity, we help identify opportunities, review product documentation, and track qualifying products toward the project's credit requirements. Opposed to having your team track down these items, let us do it for you!




Sourcing of Raw Materials

Every building starts with raw materials, but have we ever stopped to think about where those materials come from and what it takes to get them to the jobsite?


Mining, logging, and other extraction activities can have significant environmental impacts. Poorly managed practices can contribute to deforestation, habitat loss, water pollution, and harm to local communities. The impacts often happen far away from the construction site, but the materials we select can influence how those resources are managed.



The LEED v4 Sourcing of Raw Materials credit encourages project teams to look beyond the finished product and consider how its raw materials are sourced. This includes recognizing responsible extraction practices, choosing reused or recycled materials, and encouraging transparency from manufacturers about their supply chains.


So, what does this mean for the construction team?


Start by looking for opportunities in the products you're already specifying and purchasing. Some manufacturers publish corporate sustainability reports or provide documentation showing responsible sourcing practices. Reused and recycled materials may also contribute, depending on the applicable LEED credit requirements.


One area we pay particular attention to is Division 05, Metals. Structural steel and other metal products can represent a significant portion of a project's material costs while being highly recycled, making them worth reviewing early for potential credit contributions. The key is understanding which sourcing attributes qualify and collecting the documentation needed to support them.


At Verdacity, we help identify these opportunities, review manufacturer documentation, and track qualifying materials against the project's LEED goals. The earlier we look at these products, the more flexibility the team has to make informed procurement decisions.




Material Ingredients

We spend a lot of time thinking about how a building looks, how it performs, and how much energy it uses. But how often do we ask what's actually in the materials we're putting into it?



For many building products, getting detailed information about their chemical ingredients can be surprisingly difficult. Manufacturers don't always disclose everything that goes into a product, which makes it harder for project teams to understand potential health and environmental concerns when selecting materials.


Some chemicals used in building products can persist in the environment, accumulate in living organisms, and pose risks to human health and ecosystems. While regulations address certain hazardous substances, gaps in chemical hazard information make transparency especially important.


The LEED v4 Material Ingredients credit encourages manufacturers to disclose what's in their products and supports efforts to identify, reduce, and avoid potentially harmful substances. By rewarding ingredient transparency and more responsible chemical management, LEED helps project teams make better-informed decisions and encourages manufacturers to develop safer alternatives.


So, what does this mean for the construction team? As with the other material credits, it starts with product selection and submittals. Some manufacturers provide ingredient inventories, health-related disclosures, or third-party assessments that meet specific LEED requirements. Other products may qualify through programs that evaluate or optimize their chemical ingredients.


Not every disclosure automatically qualifies, and simply having an ingredient list doesn't mean a product is free of chemicals of concern. The documentation must meet the requirements of the applicable LEED credit pathway.


At Verdacity, we help identify potential products, review manufacturer documentation, and determine which products can contribute toward the project's certification goals. By looking at these opportunities during procurement, we can help the team avoid scrambling for information when construction is nearly complete.



Low-Emitting Materials

Paints, coatings, adhesives, sealants, flooring, and other building products can release

volatile organic compounds (VOCs) into the air. While some VOCs occur naturally, concentrations can be higher indoors, where ventilation may be limited and multiple sources are present. Exposure to certain VOCs can cause health problems, ranging from eye and throat irritation to longer-term health effects.


We can't eliminate every source of VOCs, but choosing low-emitting products can help reduce indoor contaminants and support a healthier environment for construction workers and future occupants.


LEED v4 establishes requirements for applicable product categories, using emissions testing, VOC content limits for wet-applied products, or qualifying inherently non-emitting materials to demonstrate compliance.


For the construction team, this means reviewing product documentation before materials are approved and installed.


At Verdacity, we track applicable low-emitting materials installed within the waterproofing membrane and review submittals to identify missing documentation before it becomes a closeout issue.


3. Put construction environmental requirements into practice

Having a plan is one thing. Making sure it's followed in the field is another.

LEED construction requirements need to be incorporated into everyday site activities and supported by documentation. The more practical we make the process, the easier it is for the team to maintain compliance.


Construction Indoor Air Quality


Construction is messy. Dust, debris, moisture, and chemicals are part of the process, but how we manage them can make a big difference in the building we're delivering.


Poor indoor air quality during construction can affect workers on site and future building occupants. Dust and other contaminants can enter HVAC systems, moisture can damage building materials, and pollutants can remain in the indoor environment long after construction is complete. Protecting indoor air quality also helps protect building materials and mechanical equipment, supporting their long-term performance.


That's why LEED v4 requires a Construction Indoor Air Quality Management Plan that follows applicable SMACNA IAQ guidelines. These guidelines outline practical strategies for controlling construction-related pollutants and protecting the building throughout the construction process.


So, what does this mean for the construction team?


  • Controlling dust and pollutants: Use appropriate dust control, housekeeping, and source-control practices to limit the spread of contaminants.

  • Protecting HVAC systems: Keep ductwork and equipment protected from construction dust and debris, and follow applicable filtration requirements when permanent air handlers operate during construction.

  • Protecting materials from moisture: Store absorptive materials appropriately and protect installed materials from moisture that could lead to damage or mold growth.

  • Maintaining a smoke-free construction environment: Follow the applicable restrictions on smoking inside the building and near building entrances.


These measures work best when the requirements are communicated to subcontractors before work begins and reinforced throughout construction.


At Verdacity, we have strategies that make tracking these activities a breeze. The goal is to give the team a straightforward way to document what's happening without creating another complicated administrative process.



Stormwater Pollution Prevention

Erosion and sediment control are important parts of managing a construction site. Depending on the project, the team may already have a Stormwater Pollution Prevention Plan (SWPPP) and established inspection procedures to meet permit requirements.


We help coordinate the applicable LEED construction activity pollution prevention requirements with the project's existing procedures and records. That way, the team can understand what documentation is needed for LEED and how it relates to the work already happening on site.


Building Flush-Out: Clearing the Air Before Occupancy

Ah, the new building smell. Some people love it; others hate it.


But that smell isn't a reliable indicator of whether a building has good indoor air quality. Some building materials release formaldehyde and volatile organic compounds (VOCs), while construction activities can leave behind dust and other airborne pollutants.


Reducing these contaminants before occupants move in helps support a healthier indoor environment. That's the goal of the LEED v4 Indoor Air Quality Assessment credit.

One option under this credit is a building flush-out. The idea is straightforward: dilution is the solution! Rather than relying on air testing to demonstrate compliance, the flush-out pathway follows prescribed ventilation and timing requirements.


So, what does this mean for the construction team?


Plan the flush-out before the building is ready for turnover. The process depends on having the HVAC system operational and capable of delivering the required outdoor airflow, if additional fans are not used. That means coordinating with the mechanical contractor, commissioning team, and project schedule to determine when the flush-out can begin and how long it needs to run.


A few things to coordinate include:

  • Construction completion: Make sure the building is sufficiently complete and ready for the flush-out to begin under the applicable LEED requirements.

  • HVAC operation & supplemental fans: Confirm the system can provide the required outdoor airflow and operate continuously for the prescribed duration. Flushout duration can be shortened if required by using additional fans to increase outdoor airflow.

  • Filtration and system protection: Follow the applicable requirements for filtration and protect the system from construction dust and debris.

  • Scheduling and documentation: Coordinate the flush-out with commissioning and occupancy plans, and maintain records demonstrating that the required conditions and duration were achieved.

At Verdacity, we help the team understand the applicable flush-out requirements and coordinate the documentation needed to demonstrate compliance. Getting this on the schedule early helps avoid a situation where the building is otherwise ready for occupancy but still needs additional time to complete the flush-out.


Make LEED Part of the Construction Process

So, after reading this, you're probably thinking, “That sounds pretty easy. Why would I need Verdacity?” Fair question. I just gave away some of our secret sauce!


The reality is, I want these things to happen whether we're on the project or not. Better buildings and better construction practices are worth pursuing regardless of who's doing the paperwork.


But knowing what needs to happen and actually getting it done during construction are two different things. That's where we add value.


With more than 300 projects supported and over 80 LEED certifications achieved since 2013, we've learned how to make the process smoother. Think of us as your LEED easy button. You focus on building. We'll help take care of the LEED.


Have a LEED v4 project coming up? Let's talk. We'd love to help make the process easier for your team.


 